UGARITIC DRAW is a distinguished provider of architectural and civil engineering design solutions, specializing in premium project packages that cater to the diverse requirements of the engineering and construction industry. Our comprehensive servic...

Project Image
Project Image
Project Image
Project Image
Project Image
Project Image
Project Image
Plumbing Works BOQ (UGARITIC-BOQ - Plumbing Works)B-218

A Bill of Quantities for the plumbing works of the same building, with 46 items across 12 sections. It covers hot and cold water supply pipes (PPR and HDPE), the drainage, vent and storm-water network (UPVC), floor drains and clean-outs, sanitary fixtures, inspection chambers and manholes, a neutralization pit for laboratory drainage, and electric water heaters.

Why it matters:

  • Separate from the civil works: the plumbing package can be priced and tendered to a plumbing subcontractor on its own.
  • Clear technical detail: pipes are broken down by diameter and pressure rating, which makes material take-off and procurement straightforward.
  • Covers medical-building requirements: hand-wash basins for clinics, an eye-wash station, accessibility grab bars, hand sanitizers, a solids interceptor and a neutralization pit.
  • Same tools as the civil file: BOQ vs. actual quantity comparison, automatic totals and a summary sheet.

Project Information

Start From

EGP 1199

Login to Download
Available Plans
Architect Unlimited Creative, Civil Elilte
Project Name
Plumbing Works BOQ (UGARITIC-BOQ - Plumbing Works)B-218
Technology
Excel
Download
Instant After Purchase