TIDP(Task Information Delivery Plan)-Outpatient Medical Clinics Building -018 P

An interactive Excel file and a PDF report that set out a detailed schedule for the design and pre-construction phase of a medical clinics building (ground + 2 floors + roof), in line with ISO 19650. The plan has 104 deliverables across 9 disciplines and 6 stages over 32 weeks, with 7 approval gates. It runs from mobilisation and the BIM Execution Plan through to Issued for Construction (IFC).

Why the data matters

1. It prevents clashes between disciplines from day one
Each discipline states which inputs it needs from the others and when they must arrive. The MIDP sheet checks these dependencies automatically, so if a deliverable that others depend on slips, the conflicts show up in red straight away. For example, delaying the architectural grid freeze reveals 7 conflicts across 6 disciplines before they become errors in the drawings or on site.

2. A realistic sequence between disciplines

  • Architecture freezes grids and levels in week 8.
  • In the same week, the MEP disciplines issue their plant room and shaft requirements, so they can be included in the architectural plans.
  • The structural and MEP models start after that.
  • Reflected ceiling plans follow the lighting and HVAC calculations; builder’s work openings follow the pipe and duct routes; and quantity take-off follows the construction drawings.

3. Every deliverable is fully defined
Each deliverable has a standard information container ID (e.g. UGT-UGD-ZZ-ZZ-DR-A-2002), a type, a Level of Development from LOD 100 to 350, a suitability code, a responsible party, a checker, an approver and a delivery format. This makes files easy to manage, review and approve on the Common Data Environment (CDE).

4. Day-to-day tracking with no extra effort

  • Changing the project start date updates every date in the file.
  • When an actual delivery date is entered, the status updates automatically (planned, in progress, delivered or late), along with the number of days late.
  • The dashboard shows, for each discipline, its number of deliverables, how they are spread across the stages, and its completion rate.

5. Structured clash coordination
A schedule of 9 coordination cycles, with set dates for model uploads, clash runs, coordination meetings and issue close-out. It comes with 8 clash tests between disciplines (e.g. Structure × HVAC, Plumbing × Fire Protection), each with its own tolerance, priority and the discipline responsible for resolving it.

6. A clear picture of who needs what, and from whom
The interface matrix maps 76 links between disciplines: what each discipline needs from the others, and when.

7. A basis for claims and decisions
The approval gates and documented delivery dates give a clear reference when discussing delays, requesting an extension of time, or assessing the impact of any change made after design freeze.

Who these files are for

  • Project and design managers: planning, tracking and stage approvals.
  • BIM managers and coordinators: managing information and clash detection cycles under ISO 19650.
  • Discipline leads in consultancy firms: setting each discipline’s plan and keeping to its dates.
  • Contractors’ technical offices: tracking drawing deliveries and linking them to quantity take-off and tendering.
  • Engineers and students: a complete worked example of a TIDP and MIDP.

Project Information

Start From

EGP 1999

Login to Download
Available Plans
Architect Unlimited Creative
Project Name
TIDP(Task Information Delivery Plan)-Outpatient Medical Clinics Building -018 P
Technology
Excel
Download
Instant After Purchase