UGARITIC DRAW is a distinguished provider of architectural and civil engineering design solutions, specializing in premium project packages that cater to the diverse requirements of the engineering and construction industry. Our comprehensive servic...

Project Image
Project Image
Project Image
Project Image
CDF-ST: Structure & Repair Materials

7 components · 22 parameters · 100% compliance

Content: C30 ready-mix concrete, grade 40/60 rebar, CEM I cement, repair mortar, crack-injection epoxy, CFRP laminates and anchoring epoxy.

Why it matters:

  • Technical data is the strength here: 28-day cube strength, water/cement ratio, yield stress, elongation, and CFRP tensile strength and modulus. These values feed directly into the structural calculations, and any shortfall means the design is no longer satisfied.
  • Reference standards (ECP 203, ES 262, EN 1504 and ACI 440.2R) tie each material to the code the building was designed to.
  • Laboratory test reports in this discipline are not a formality; they are the proof of safety.
  • Repair and strengthening materials are applied to existing elements, and a mistake cannot be undone after execution. That is why the file keeps any material out of site until it is approved.

What the file contains :

Submittal Register
Lists each component with its ID, CSI section, reference standard, BOQ item, supplier, submittal number, revision, dates and status. It matters because it is one official log showing where each submittal stands, how long the review took, and who is late.

Technical Data
Each parameter has three values: the requirement per specification (minimum, maximum, range or match), the supplier’s offered value, and an automatic result. It matters because approval decisions rest on numbers, not impressions, and any non-compliance shows up immediately.

Attached Documents
Eight documents: datasheet, conformity certificate, test report, sample, certificate of origin, warranty, MSDS and compliance statement. They matter because they prevent approving a material with an incomplete file, and tell the supplier exactly what is missing.

Component Card
One page per material combining its data, results, documents and consultant comments. It matters because it is ready to print and attach to approval or handover minutes.

Dashboard
Shows the distribution of statuses A/B/C/D/U, the technical compliance rate, and the submittals needing follow-up. It matters because it gives management a quick picture of the discipline’s position without opening every submittal.

Consistency Check
Raises the alert “⚠ Approved despite non-compliance”. It matters because it prevents approving a material whose values fail, whether by oversight or under pressure.

Project Information

Start From

EGP 1199

Login to Download
Available Plans
Civil Elilte
Project Name
CDF-ST: Structure & Repair Materials
Technology
Excel
Download
Instant After Purchase