UGARITIC DRAW is a distinguished provider of architectural and civil engineering design solutions, specializing in premium project packages that cater to the diverse requirements of the engineering and construction industry. Our comprehensive servic...

Project Image
Project Image
Project Image
Project Image
CDF-AR: Architecture & Finishes

19 components · 49 parameters · 94% compliance

Content: blocks, porcelain, ceramics and granite, anti-static vinyl flooring, emulsion, antibacterial and epoxy paints, suspended ceilings, cladding, aluminium profiles, double glazing, fire-rated and lead-lined doors, waterproofing and thermal insulation, and toilet partitions.

Why it matters:

  • It is the most varied discipline in materials and suppliers, so the register is the only tool that brings 19 approval tracks together in one place.
  • Technical data caught non-compliance before delivery:

    • AR-10 ceiling tiles were returned as C because of sound absorption.
    • AR-13 double glazing was returned as C.
    • AR-11 composite panels were rejected as D.

    Discovered after installation, these would have cost demolition and replacement.

  • Healthcare-specific properties: anti-static floors, antibacterial paint and lead equivalence in X-ray rooms. These are functional and safety requirements, not just finishes.
  • The dashboard keeps open submittals (C, D and U) visible, and this discipline has more of them than any other.

What the file contains :

Submittal Register
Lists each component with its ID, CSI section, reference standard, BOQ item, supplier, submittal number, revision, dates and status. It matters because it is one official log showing where each submittal stands, how long the review took, and who is late.

Technical Data
Each parameter has three values: the requirement per specification (minimum, maximum, range or match), the supplier’s offered value, and an automatic result. It matters because approval decisions rest on numbers, not impressions, and any non-compliance shows up immediately.

Attached Documents
Eight documents: datasheet, conformity certificate, test report, sample, certificate of origin, warranty, MSDS and compliance statement. They matter because they prevent approving a material with an incomplete file, and tell the supplier exactly what is missing.

Component Card
One page per material combining its data, results, documents and consultant comments. It matters because it is ready to print and attach to approval or handover minutes.

Dashboard
Shows the distribution of statuses A/B/C/D/U, the technical compliance rate, and the submittals needing follow-up. It matters because it gives management a quick picture of the discipline’s position without opening every submittal.

Consistency Check
Raises the alert “⚠ Approved despite non-compliance”. It matters because it prevents approving a material whose values fail, whether by oversight or under pressure.

Project Information

Start From

EGP 1999

Login to Download
Available Plans
Architect Unlimited Creative
Project Name
CDF-AR: Architecture & Finishes
Technology
Excel
Download
Instant After Purchase