Ready-to-use Excel files for 53 plumbing items (46 from the BOQ + 7 added): water supply and drainage pipes, floor drains and clean-outs, sanitary fixtures, the external network, water heaters, and tanks and pumps.
Why these files matter
- An item for every diameter and fixture: PPR, UPVC and HDPE pipes by diameter, and every fixture and manhole as a separate item.
- Specifications in numbers: operating pressure, 30 cm sand bedding, 40-ton manhole covers, and heater capacities.
- Testing first: a pressure test at 1.5 × working pressure for 24 hours, a drainage fill test, and disinfection of the drinking-water network before payment.
- Clear item boundaries: pipework inside toilets is included in the fixture items, so nothing is paid twice.
- Complete handover: as-built drawings and operation and maintenance manuals before handover.
Who these files are for: technical offices, mechanical supervision engineers, plumbing contractors, and cost engineers.