1. The primary objective of the report is to: 🎯
Verify the steel grade: Ensure that the grade and quality of the supplied steel (e.g., Grade 60 or B500B) comply with the project's engineering designs. Validate laboratory test results: Link the supplied shipment to the Certificate of Origin, Mill Test Certificates (MTC), and the results of steel tensile and bending tests. Prevent the use of defective steel: Reject any steel exhibiting severe rust, corrosion, or manufacturing defects that could compromise the structural integrity.