UGARITIC DRAW is a distinguished provider of architectural and civil engineering design solutions, specializing in premium project packages that cater to the diverse requirements of the engineering and construction industry. Our comprehensive servic...

Project Image
QC.30 Determ Modified Proctor

1. Brief Description of the Report

The document is a specialized laboratory analytical datasheet designed to record physical compaction variables across sequential soil sub-samples under varied moisture increments [wOxhIa]. It consists of the following key sections:

  • Location & Sampling Identification: Entry fields to document the physical field coordinates or zone (Location) and the unique identifier index (No. of Sample) [wOxhIa].
  • Compaction Analytical Matrix (The Core Table): Structured into four distinct testing trials (Sample 1, 2, 3, 4) to track and calculate the following parameters:
    • Weight of Soil - Mould (gm) and Weight of Mould (gm): To deduce the raw wet mass of the compacted soil core [wOxhIa].
    • Volume of Mould (cm³) and resulting bulk Density of Soil (gm/cm³) [wOxhIa].
    • Moisture Content Tracking Lines: Including Weight of Moist Sample (gm), Weight of Dry Sample (gm), Weight of Moist (gm), and Weight of Container (gm) to analyze water percentage [wOxhIa].
    • Final Mathematical Output Fields: To log the final calculated Moisture (%) and Max. Dry Density (gm/cm³) for each trial run [wOxhIa].
  • Remarks & Geotechnical Authorization: A text box for structural engineering observations (Remarks), followed by a mandatory verification sign-off block requiring signatures and dates from the Contractor Representative, Q.C. Inspector, and Consultant as the official witness [wOxhIa].

2. Purpose of the Report

The primary purpose of this report is to scientifically discover the soil's Optimum Moisture Content (OMC) and its Maximum Dry Density (MDD), establishing the absolute target reference used to approve or reject field backfilling operations. Its core objectives include:

  • Establishing the Ultimate Field Audit Baseline: This laboratory test provides the definitive target number (Max. Dry Density) against which all in-situ field checks (such as the Sand Cone Method or Nuclear Density Gauge) are measured to calculate the compaction percentage [wOxhIa].
  • Determining the Ideal Water Volume for Field Rolling: It indicates the precise percentage of water the contractor must spray over the soil layers in the field; adding too much water (muddying) or too little water (high friction) prevents soil grains from interlocking, leading to field compaction failure.
  • Shielding Foundations and Pavements from Settlement: Compacted sub-grade soil processed according to Modified Proctor parameters eliminates internal structural air voids, significantly maximizing soil bearing capacity and preventing future structural cracking or sinkholes under buildings and roadways.
  • Geotechnical Certification & Archival Records (Distribution): Storing a legally binding material testing document distributed to the Construction Manager, Consultant, and Contractor to update the final project closeout register [wOxhIa].

 

Project Information

Start From

EGP 1199

Login to Download
Available Plans
Civil Elilte
Project Name
QC.30 Determ Modified Proctor
Technology
Excel
Download
Instant After Purchase