QC.31 Survey Works Checklist

1. Brief Description of the Report

The document is a highly structured engineering field-audit form designed to verify spatial and dimensional accuracy against geodetic reference marks [GIMPoX]. It consists of the following key sections:

  • Site Reference & Boundary Profiling: Fields to specify the Contractor's name, Package Reference, Building Name, Specified Location of the survey check, and the approved Drawing Reference [GIMPoX].
  • Core Technical Inspection Modules (Description of Activities): A tabular audit grid containing 8 baseline survey criteria [GIMPoX]:
    1. Control Points: Verifying the stability and accuracy of the primary site reference stations [GIMPoX].
    2. Bench Mark: Checking the vertical datum point (TBM) used as the absolute height reference for the entire project [GIMPoX].
    3. Alignment: Auditing the linear and structural grid line positioning of building elements [GIMPoX].
    4. Coordinates: Confirming the exact Northing and Easting grid points using total stations or GPS [GIMPoX].
    5. Levels: Verifying finished floor elevations, excavation depths, and structural heights [GIMPoX].
    6. Vertically: Conducting verticality and plumbness checks on columns, shear walls, or formwork shutters [GIMPoX].
    7. Data: Reviewing raw computational survey printouts or digital data sheets extracted from field instruments [GIMPoX].
    8. Others: Open lines for any project-specific survey requirements [GIMPoX].
  • Actionable Evaluation Matrix & Validation: Functional side-by-side compliance checkboxes for each activity offering three distinct paths: ACCEPT, REJECT, or HOLD, alongside inspector initialization lines and inspection dates [GIMPoX].
  • Remarks & Geodetic Authorization: A wide workspace for narrative technical notes (Remarks), with a checkbox indicator for attached raw coordinates (DATA - PLEASE SEE ATTACHED) [GIMPoX]. This is followed by mandatory validation sign-offs requiring signatures and dates from the Contractor Representative, Q.C. Inspector, and Consultant as the official witness [GIMPoX].

2. Purpose of the Report

The primary purpose of this checklist is to field-verify that the physical boundaries, structural grid lines, and elevations of the building are staked out with absolute precision to eliminate critical layout displacements or boundary encroachment risks. Its core objectives include:

  • Eliminating Legal Boundaries and Orientation Defects: Rigorously auditing Control Points and Coordinates ensures that the permanent facility is erected exactly within its legal property limits, completely avoiding encroachment onto municipality road lines or adjacent plots.
  • Securing Vertical Datum Control across Utilities: Confirming the established project Bench Mark and structural Levels shields the project from vertical calculation mistakes, directly ensuring that gravity-fed drainage networks, basement ramps, and external road connections tie in perfectly.
  • Guaranteeing Structural Plumbness and Load Transfers: Reviewing the axial Alignment and component Vertically before pouring concrete prevents structural eccentricities, ensuring that heavy structural dead loads travel vertically downward into the foundations without introducing unintended tilting stresses.
  • Survey Certification & Archival Accountability (Distribution): Storing a legally binding geodetic compliance record distributed to the Construction Manager, Consultant, and Contractor to serve as the baseline for as-built documentation [GIMPoX].

Project Information

Start From

EGP 1199

Login to Download
Available Plans
Civil Elilte
Project Name
QC.31 Survey Works Checklist
Technology
Excel
Download
Instant After Purchase